3.6% Average annual electricity-demand growth IEA forecast for 2026–2030, supported by industry, transport, buildings and data centres. IEA Electricity 2026 ↗
€584bn EU grid investment required by 2030 The European Commission frames modernisation, capacity and flexibility as a major infrastructure need. European Commission ↗
50% Low-emissions share of global generation by 2030 Renewables and nuclear are forecast to reach half of global generation, increasing conversion and grid-control complexity. IEA Electricity 2026 ↗
Cybolution's entry wedge Specialised demand, not commodity volume. The initial focus is on applications where qualification pain, discontinued components, engineering access and traceable small lots matter more than catalogue pricing. This is a narrower market than all power semiconductors — and a more realistic place for a seed-stage supplier to win.
Priority demand pools Grid conversion and protection Industrial drives and rectifiers Rail and traction infrastructure Welding and high-current supplies Long-life legacy equipment Custom and second-source programmes
Distributed-gate thyristor chipsRound silicon SCR chips with a branching distributed gate pattern, peripheral guard region and protected bevel for high-voltage edge control.
Round diode chipsCircular silicon diode chips with uniform active metallisation, perimeter guard rings and a protected beveled edge, ready for downstream bonding and assembly.
Partner completionCybolution controls first diffusion and thickness. A qualified mass-production partner completes downstream wafer processing, beveling, die preparation and Si–Mo bonding.
Equipment JVOnce the route is repeatable, selected production equipment moves into a European joint venture with defined ownership, operating rules and product rights.
Partner-share buyoutA pre-agreed path allows Cybolution or a follow-on investor to acquire the partner's JV stake after technology and demand milestones are met.